Instead of dropping the new participant onto another link participant, you can open the All Links dialog box and drop the new participant on the control link itself. In this case, you should think of the control link in the dialog box as a bucket into which you are adding a new control. The following procedure outlines the steps:
- Follow steps 1 and 2 in the above procedure.
- In the Halogen Processing Workspace toolbar, click Linking:
- In the All Links dialog box that displays, select the appropriate tab for the link to which you are adding a participant: Level, Select, Toggle, Command:
- Locate the new participant and drag its link icon onto the control link: